this is very helpful,
I'm redoing my kitchen,
and looking at plumbing as well,
hope I'm not hijacking thread
does anyone have a photo to share of hole placement on bench, (towards back?, where does it need to align with machine), eventually looking to upgrade to Duetto,
but want to organise plumbing while kitchen is being done.
how large must the hold in the stone be?
can it go via the splash back instead?
and do you need two hole?, one for drainage and one for water supply.
and what is this thing about the PLV,
thanks
I'm redoing my kitchen,
and looking at plumbing as well,
hope I'm not hijacking thread
does anyone have a photo to share of hole placement on bench, (towards back?, where does it need to align with machine), eventually looking to upgrade to Duetto,
but want to organise plumbing while kitchen is being done.
how large must the hold in the stone be?
can it go via the splash back instead?
and do you need two hole?, one for drainage and one for water supply.
and what is this thing about the PLV,
thanks

Comment